Kororāreka Russell Township

District plan rules for the Kororāreka Russell Township in Far North, New Zealand.

Summarised from the Far North District Plan. This is a summary compiled from the council's published plan, not the plan itself — and not legal or planning advice. Always verify against the council's official document before relying on any figure, and check whether a more recent plan change applies.

Kororāreka Russell Township — Far North

Building Standards

RuleValueNotes
Maximum height (permitted)10mOrongo Bay Special Purpose Zone
Maximum height (restricted discretionary)11mWith consent, subject to visual impact assessment
Setback from Aucks Road10mMinimum; area must be landscaped
Setback from Russell Road10mMinimum; area must be landscaped
Setback from site boundaries adjoining planting areas3mMinimum from identified planting on Concept Plan
Recession plane45 degreesMeasured inwards from 2m above ground level on boundaries adjoining Coastal Living or Recreational Zones
Building colour reflectance30% or lessBS5252 standard colour palette, or natural materials within this range

Landscaping & Visual Amenity

RuleValueNotes
Landscaping setback depth — Aucks Road frontage6m wideMinimum planting depth
Landscaping setback depth — Russell Road frontage10m wideMinimum planting depth
Landscaping setback depth — "the knoll" adjacent Russell Road20m wideMinimum planting depth
Landscaping setback depth — sports field and adjacent Coastal Living Zones5m wideMinimum planting depth
Signage — pylon sign (Aucks Road entrance)12m² maximum, double-sidedSingle sign only at site entrance
Signage — pylon sign (Russell Road entrance)6m² maximum, double-sided, 4m height maximumSingle sign only at site entrance
Sign illumination cutoff2200 hoursSigns on buildings must not be illuminated after this time
Landscaping maintenance requirementOngoingDiseased or damaged vegetation must be replaced; must remain on site for duration of activity
Landscaping implementation timingPrior to building construction or bondedBond arrangement per Council Policy 3120 for implementation within 3 years, before occupation
Landscaping speciesIndigenous varieties predominating local speciesMust provide solid visual screen on zone boundary; contribute to coastal character

Permitted Activities

ActivityStatusConditions
Commercial activities (service-oriented)PermittedMust comply with all standards in Rules 18.8.6.1.1–18.8.6.1.13; must comply with Outline Concept Plan (Appendix 6H); must comply with approved Comprehensive Development Plan; ecological corridors, landscaping, and stormwater/effluent treatment must be completed

Controlled Activities

ActivityStatusNotes
Access pointsControlledLimited to single entry/exit on Aucks Road and single entry/exit on Russell Road only; must comply with chapter 26 of Council's General Bylaws and Austroads' Guide to Traffic Engineering Practice

Restricted Discretionary Activities

ActivityTriggerNotes
Building height exceeding 10mNon-compliance with Rule 18.8.6.1.1Maximum 11m; subject to visual impact, overshadowing, privacy, and sunlight assessment
Noise exceeding permitted limitsNon-compliance with Rule 18.8.6.1.6Council discretion restricted to noise character, level, duration, and effectiveness of mitigation
Non-complying specific activitiesNon-compliance with Rule 18.8.6.1.9Subject to comprehensive assessment
Comprehensive Development Plan approvalAll subdivision, use or developmentMandatory requirement prior to any site activity (Policy 18.8.4.6)

Stormwater & Effluent Management

RuleValueNotes
Stormwater discharge methodPiped connection to approved outfallMinimum 600mm depth into net area of site
Stormwater interceptor systemRequiredMust prevent contaminants stored/used on site from entering stormwater discharge unless treated through interceptor system
Stormwater design standardTechnical Publication 10, Stormwater Management Devices – Design Guidelines Manual (Auckland Regional Council 2003)Onsite volume control practices mandatory
Stormwater hydrological neutralityRequiredPeak volumes and duration must avoid/mitigate adverse effects on receiving environments, particularly oyster farms
Effluent provisionThree Coastal Living lots contiguous to siteComprehensive Development Plan must include effluent treatment provision for these adjacent properties
Effluent quality standardRegional Coastal Plan for Northland General Quality Standard CAApplies to receiving waters (Orongo Bay)
Contaminant concentration limitNo hazard to human health or coastal environmentStormwater must not contain suspended solids, industrial by-products, oil, or other contaminated substances in hazardous concentrations
Hazardous materials policyProhibitedActivities with potential to introduce hazardous materials via leakage/spillage into coastal environment are inappropriate (Policy 18.8.4.7)

Comprehensive Development Plan Requirements

ElementRequiredDetails
Internal site designYesLocation of proposed lots, appearance, design, materials, scale of all buildings
External accessYesLimited to single entry/exit on Aucks Road and single entry/exit on Russell Road
Internal access & parkingYesAccess ways, car parking, vehicle circulation, storage areas
Infrastructure & servicesYesLocation of all infrastructure including stormwater and effluent collection, treatment, disposal
Stormwater & effluent management planYesLocation of plant/disposal areas, collection, treatment (including detention ponds), disposal methods, control and management; treatment to Orongo Bay oyster farming standards
Landscape planYesPrepared by suitably qualified persons; includes planting implementation, fencing, maintenance, bonding, formal protection mechanisms (vesting/covenanting)
Riparian restoration planYesPrepared by suitably qualified persons; integrated management of riparian and wetland areas per Outline Concept Plan (Appendix 6H)
Earthworks managementYesDetails of all earthworks including run-off management during construction
Signage & illuminationYesAll signage and illumination requirements
Vegetation clearanceYesDetails of any vegetation clearance requirements
Development stagingYesProposals for any staging of development within zone
Activity typesYesDetails of types of activities permitted within zone
Binding mechanismYesMethods to ensure plan applies to and binds any other owner of land or part thereof

Cross-Referencing to District-Wide Provisions

ChapterRuleApplies to Orongo BayNotes
Chapter 12Natural and Physical ResourcesYesRefer to Resource Maps
Chapter 13SubdivisionYesStandard subdivision rules apply
Chapter 14Financial ContributionsYesStandard contributions apply
Chapter 15.1Traffic, Parking and AccessYesSubject to zone-specific access controls (single entry/exit points)
Chapter 16Signs and LightingYesSubject to zone-specific signage limits
Chapter 17Designations and Utility ServicesYesRefer to Zone Maps
Chapter 12.7Lakes Rivers Wetlands and the CoastlineYesApplies to below-ground wastewater components (TP58 On-site Wastewater Systems Design and Management Manual and Regional Water and Soil Plan for Northland also apply)

Environmental Outcomes Expected

OutcomeDescription
Environmental controlsControls that account for commercial activity needs while safeguarding amenity of adjacent areas and sustainability of natural and physical resources
Service facilitiesLimited range of service-oriented commercial facilities compatible with surrounding coastal environment
Integrated managementAll land development and ongoing management in accordance with Outline Concept Plan and approved Comprehensive Development Plan
Marine farming protectionNo adverse effects on Orongo Bay waters and operation of oyster farms
Infrastructure designAll works required to achieve expected outcomes designed and implemented prior to building construction or covered by suitable bond arrangement per Council Policy 3102

Key Restrictions & Prohibitions:

  • Activities introducing hazardous materials into coastal

Other zones in Far North